PWR-ENG-AC course offers comprehensive insight into the operation and relationship of the various Alternating Current (AC) power components found in a telecommunications building. The entire system, as well as each component of the AC power system, is discussed. You will learn how to plan and design a standby AC system, including the ventilation, exhaust and fuel systems to ensure that the standby AC system is operationally fit in the event of a commercial AC power failure. You will also learn to provision an Uninterruptible Power Supply (UPS) that will satisfy the critical AC loads for Data Centers, Network Operations Centers, Directory Assistance centers as well as other critical AC powered facilities. Exercises and casework reinforce concepts presented in the classroom.
Upon course completion, you will be tested to reinforce your knowledge and determine areas for further study. Successful completion of this test will earn TPI Trainers Certification.
Customization: PWR-ENG-AC reflects current industry standards and can be customized and presented at your location to meet the unique needs of specific work groups, such as installation technicians and managers, facility maintenance technicians, network maintenance technicians and technical support engineers. |
| |
| Audience: |
| |
| Telecommunications personnel (engineers, planners, supervisors and technicians) responsible for ensuring adequate AC power and standby power deployment within the telecommunications network. Personnel, who install, maintain and accept AC power applications will also find this training valuable. |
| |
| Prerequisites: |
| |
| A basic understanding of power plant components is recommended. This basic knowledge can be gained through completion of Telecommunications Power Elements (POWER-L). |
| |
| Customize it: |
| |
| This 4-5-day PWR-ENG-AC - Telecom AC Power Engineering course will be customized to your needs and specifications. Eno.com will assist you in identifying those needs and specifications. A word to the wise, there are many vendors of Telecommunications training. They will typically have a broad and general course, one size fits all, already developed and just put your organization?s name on the title slide. This minimizes their effort and time investment. At Eno.com, every course is made to your exact and exacting specifications. We help you ensure what you are getting is what you really need even if at the beginning you weren't too sure of what that was. We fit the class to your needs. We never fit you into our standard, one size fits all, class. |
| |
| Objectives: |
| |
|
You Will Learn
- Calculation of power factors and AC amperes.
- AC distribution.
- Proper sizing of an Uninterruptible Power Supply (UPS) and associated batteries.
- Design of a standby generator system and associated peripherals, including fuel, exhaust and ventilation systems.
Take Home Materials: You will receive a comprehensive course manual with numerous diagrams that will be useful as a reference back on your job. |
| |
| Course Outline |
| |
|
Safety precautions:
- General installation
- ESD
- Installation and maintenance batteries
- Working on live power
Telecommunications Equipment Impacts
- MOP (Method of Procedure)
- Service Continuity
Protection of Equipment
- General insulation practices
- Insulated tools
Classes of AC Power
- Commercial
- back-up generators
- Inverters
- UPS (Uninterruptible Power Systems
DC Power Systems Function
- Equipment voltage limits
- Minimum voltages
- voltage drop requirements
The Various Components
- Batteries
- Rectifiers
- Controllers
- Converters
- Secondary power distribution bays
- Power distribution cable
Flooded Batteries
- Lead calcium
- Lead-antimony
- Pure lead
VRLA (Valve Regulated Lead-Acid)
Thermal Runaway
- How does it occur?
- How to detect it?
Types of rectifiers
- SCR (silicon controlled)
- Ferro (ferroresonant)
- SMR (High Frequency)
Circuit Protection Devices
- Fuses
- Circuit breakers
- Fuse / circuit breaker co-ordination
- Power cabling
Proper Grounding Methods
- Grounding system
- CBN (Common Bonding Network)
- IBN (Isolated Bonding Network)
- Power plant grounding
Testing & Acceptance Procedures
- Functional
- Operational
- Documentation
|
| |
| |
|